Explosion Proof HVAC System and Deviced, IECEx & ATEX Certificate
Explosion Proof HVAC System and Deviced, IECEx & ATEX Certificate
The FPSO will be deployed in the Offshore Area 1 some 10 km off the coast of Mexico at a water depth approximately 32 m.
The FPSO will be deployed in the Offshore Area 1 some 10 km off the coast of Mexico at a water depth approximately 32 m.
The FPSO will be deployed at the Mero (formerly Libra) field operated by Petróleo Brasileiro S.A. (Petrobras) and partners of Libra Consortium, in the giant “pre-salt” region of the Santos Basin some 180 kilometers off the coast of Rio de Janeiro, Brazil
The FPSO will be deployed at the Mero (formerly Libra) field operated by Petróleo Brasileiro S.A. (Petrobras) and partners of Libra Consortium, in the giant “pre-salt” region of the Santos Basin some 180 kilometers off the coast of Rio de Janeiro, Brazil
The FPSO will be deployed at the Sépia field operated by Petróleo Brasileiro S.A. (Petrobras), located in the giant “pre-salt” region of the Santos Basin some 250 kilometers off the coast of Rio de Janeiro, Brazil at a water depth approximately 2,200 mete
The FPSO will be deployed at the Sépia field operated by Petróleo Brasileiro S.A. (Petrobras), located in the giant “pre-salt” region of the Santos Basin some 250 kilometers off the coast of Rio de Janeiro, Brazil at a water depth approximately 2,200 mete
2020/12/07 Ridderkerk 1 -
Post requirements:
Bachelor degree or above, major in mechanical design or processing, more than 3 years of experience. Proficient in English, understand relevant design drawings and annotations, and have good communication skills.
Job content:
Product structure design, coordinating process flow and quality control with processing personnel, requires proficient application of 3D software (SOILDWORKS). Able to model product parts according to the process.